Two-week lookahead, built not typed
Every Friday afternoon, the superintendent opens the master schedule, a delivery tracker, an inspection list, and last week's lookahead, then rebuilds the next two weeks by hand. It takes a chunk...
The problem
Every Friday afternoon, the superintendent opens the master schedule, a delivery tracker, an inspection list, and last week's lookahead, then rebuilds the next two weeks by hand. It takes a chunk of the afternoon. Most of that time is not thinking. It is copying.
The thinking is the valuable part: will the racking crew have material on Tuesday, is the inspector confirmed for the trenching before backfill, can the electrical sub start string wiring if the combiner boxes are still showing a late ship date. The copying crowds that out.
When the lookahead is built tired and in a hurry, errors creep in. A delivery date goes stale. An inspection that was rescheduled on Wednesday still shows the old day. The foremen plan around the document, so a bad line costs a crew a morning.
How the agent workflow works
The agent runs on a schedule, Thursday evening or Friday morning, so the superintendent has a draft before the afternoon starts.
What it reads:
- The project schedule export, filtered to activities starting or in progress over the next fourteen days.
- Open material orders, meaning purchase orders and delivery confirmations, with promised dates and any supplier notes.
- Pending inspections and permit items, including requested dates and any confirmation emails.
- Last week's lookahead, so it can mark what carried over.
What it produces: A draft lookahead organized by day and by crew or trade. Each activity lists the material it depends on and the inspection it is waiting on, if any. The agent also writes a short flag list at the top, covering items such as:
- An activity scheduled to start before its material is due.
- An inspection that must pass before the next activity can begin, with no confirmed date.
- A delivery date that changed since last week.
- An activity that slipped from last week's lookahead with no explanation.
Where the human checks it: The superintendent reads the flag list first, then edits the draft. Nothing goes to foremen or subs until the superintendent approves it. The agent has no ability to send the lookahead, change the schedule, or contact a supplier. It drafts and flags. The superintendent decides what is real, resequences the work, and owns the final document.
What you need to set it up
- An AI assistant that can read files or connect to your schedule, order tracker, and email. Many general-purpose assistants can do this with the right connections.
- Exports from your schedule, in whatever format your scheduling software produces, such as a spreadsheet or PDF.
- A delivery and inspection list that lives in one place. A shared spreadsheet works. If it lives in six inboxes, fix that first.
- Your current lookahead template, so the agent matches the format your foremen already read.
- A written instruction sheet describing your rules: how you group by trade, what counts as a flag, how far ahead inspections need confirmation.
Setup time is a few hours for a first working version, mostly spent cleaning the delivery and inspection list and writing the instructions. Expect another few rounds of adjustment over the first month as you see what the agent misses.
Where it breaks
Stale inputs. The agent only knows what is written down. If a supplier called the foreman about a delay and nobody updated the tracker, the draft will confidently show the old date. The flag list will not catch what was never recorded.
Logic the schedule does not hold. Experienced supers carry sequencing in their heads: the crane is shared, the access road floods, the inspector never confirms until the day before. The agent will not know unless you write it into the instructions, and even then it will miss exceptions.
Messy exports. Schedule exports with odd formatting, merged cells, or renamed activities can cause misreads. An activity matched to the wrong delivery is worse than a missing one, because it looks verified.
Over-trusting the flag list. A clean flag list does not mean a clean two weeks. If the superintendent starts skimming, the checkpoint becomes a rubber stamp.
Inspection emails. Confirmations written in loose language, such as "we'll try to get out Thursday," may be read as firm. Treat any inspection date from free text as unconfirmed until you verify it.
The bottom line
This workflow takes the assembly work off the superintendent and leaves the judgment where it belongs. The agent compiles and cross-checks. The superintendent decides.
It is only as good as the schedule, order tracker, and inspection list behind it. Start with one project, compare the draft against what you would have built by hand for a few weeks, and note every miss. Those misses tell you what to add to the instructions and what to keep checking yourself.